How long did it take to build the bridge? Construction of the golden gate bridge took a total of 1,604 days or a little over 4 years and 4 1/2 months. Work began on january 5, 1933, and the bridge opened to vehicular traffic on may 28, 1937.
How Long Did It Take to Build the Golden Gate Bridge?
The Golden Gate Bridge is one of the world’s most iconic structures, and its construction was a feat of engineering and design. But just how long did it take to build the Golden Gate Bridge?
The answer is not as straightforward as you might think. The Golden Gate Bridge was an ambitious project requiring much planning, engineering, and construction. The process began in 1933 when the Golden Gate Bridge and Highway District was formed to oversee the project. The next year, the district hired the engineer Joseph Strauss to design the bridge.
The actual construction of the bridge began in January 1933, and the bridge was opened to traffic on May 28, 1937. However, the bridge was not officially completed until April 19, 1938. That’s because the bridge was built in two stages. The first stage was the construction of the south tower and suspension span, which was completed in May 1937. The second stage was the construction of the north tower, which was completed in April 1938.
The total time it took to build the Golden Gate Bridge is just over four and a half years. That might seem like a long time, but it’s actually an impressive achievement for a project of this magnitude. The bridge was built by
Leave a comment