The 60-foot bust memorial was the vision of sculptor gutzon borglum and took 14 years to complete. From 1927 to 1941 men and women worked to blast and carve the faces of presidents george washington, thomas jefferson, theodore roosevelt and abraham lincoln into the south dakota mountain.
How Long Did It Take to Complete Mount Rushmore?
Mount Rushmore, located in South Dakota, is one of the most iconic monuments in the United States. It is a massive sculpture made up of the faces of four former presidents: George Washington, Thomas Jefferson, Theodore Roosevelt, and Abraham Lincoln. The monument was completed in 1941 and is considered one of the most successful pieces of public art in the world.
When Gutzon Borglum began work on Mount Rushmore in 1927, he had a vision of creating a lasting symbol of the nation’s history and unity. The project, however, was no small task. The monument was carved out of the side of a mountain and required hundreds of workers. In addition to the physical labor, the project also required a great deal of planning and engineering.
The carving process began in 1927 and continued until 1941. The workers used a variety of tools, including jackhammers, drills, and dynamite to shape the mountain. The process was slow and dangerous. Many of the workers were injured or killed in accidents.
Once the faces had been carved, the workers began to work on the details. They used a variety of techniques to create lifelike features, including chiseling, drilling, and sandblasting. The workers also
Leave a comment