The 60-foot bust memorial was the vision of sculptor gutzon borglum and took 14 years to complete. From 1927 to 1941 men and women worked to blast and carve the faces of presidents george washington, thomas jefferson, theodore roosevelt and abraham lincoln into the south dakota mountain.
How Long Did Mount Rushmore Take?
Mount Rushmore is one of the most iconic landmarks in the United States of America. Constructed between 1927 and 1941, it is a massive sculpture of the heads of four US presidents carved into the face of the granite mountain known as Mount Rushmore. The presidents depicted are George Washington, Thomas Jefferson, Theodore Roosevelt, and Abraham Lincoln.
The construction of Mount Rushmore began in the summer of 1927 and was completed fourteen years later in October 1941. The project was led by the sculptor Gutzon Borglum who, along with his team of 400 workers, used dynamite and jackhammers to carve the faces of the presidents into the mountain. The sheer scale of the project was immense and it required a great deal of planning and technical expertise.
The first step in the construction of Mount Rushmore was to survey the site and develop a blueprint for the project. This included creating a model of the mountain and the presidents’ faces to be carved into the granite. The work then began in the summer of 1927, with workers blasting and removing large chunks of granite from the mountain. Borglum estimated at the time that the project would take six years to complete, but it actually took much longer.
In order to ensure accuracy and precision