How Long Did the Burj Khalifa Take to Build?

How long did it take for the burj khalifa to be built? The burj khalifa took six years to build. Foundational excavation work commenced in january 2004, and the tower was formally opened on january 4, 2010. However, the opening took place before the interior was completed.

How Long Did the Burj Khalifa Take to Build?

The Burj Khalifa, located in Dubai, United Arab Emirates, is a skyscraper that stands 828 meters (2,717 feet) tall, making it the world’s tallest building. The iconic structure was designed by the architecture firm Skidmore, Owings & Merrill, and construction began in 2004. It took a total of five years for the building to be constructed, with the official opening taking place in 2010.

The Burj Khalifa was designed as a mixed-use building, with commercial, residential, and hospitality elements. As a result, the construction process was very complex, requiring extensive planning and coordination. Building the structure was a huge engineering feat and involved thousands of workers from over 30 countries.

Before construction began, the site underwent extensive soil testing and preparation, with specialized equipment being used to help ensure the site was safe and secure. During the construction process, the building rose at a rate of one floor every three days. This was made possible due to the use of high-tech machinery and a specialized formwork system.

The exterior of the building was clad in thousands of glass panels, which were installed by a fleet of cranes. Additionally, the building was equipped with over 30,000 lights, and dozens of