How Long Does It Take to Install a Concrete Pool?

For a fully custom concrete-lined pool, wall and floor installation can take anywhere from 20 to 60 days. This step is dependent not only on the design of your pool but also on the weather, so make sure to take the seasons into account when budgeting your time.

How Long Does It Take to Install a Concrete Pool?

Installing a concrete pool is a major undertaking, and it requires both time and money to achieve. The exact amount of time it takes to install a concrete pool will depend on the size of the pool and the complexity of the job. Generally speaking, most concrete pools take anywhere from two to four weeks to install.

Before the actual installation process begins, there are a few steps that must be taken. First, a professional pool designer must be consulted to create a design for the pool. The pool design will include the size of the pool, the shape of the pool, and other details such as the type of coping and tile that will be used. This process can take anywhere from a few days to a few weeks, depending on the complexity of the design.

Once the pool design is finalized, the excavation process can begin. This involves digging a hole in the ground that is large enough to accommodate the pool. The excavation process can take anywhere from two days to two weeks, depending on the size of the pool and the type of soil it needs to be dug in.

After the excavation is complete, the pool shell is poured. This is a process that requires special materials and experienced labor, and it can take anywhere from one day to