Tiling should begin within 16 hours of mortar bed installation. After 24 hours, the mortar bed enters a “green” state and cannot have tile adhered for 28 days.
How Long Should Mud Bed Cure Before Tiling?
Mud beds are an essential part of any tile installation. They provide a smooth, level surface for tile to rest on and provide a secure base for the tiles to bond to. But how long should a mud bed cure before tiling?
The short answer is that it depends. Generally, a mud bed should cure for at least 24 hours before you start tiling. This is because the mud bed needs time to dry and harden so that it is strong enough to support the weight of the tiles. If the mud bed is not fully dry and cured, it could crack or break when the tiles are installed, leading to an uneven or unsightly tile installation.
When installing a mud bed, it is important to use the correct materials and techniques. The mud bed must be made with a material that is compatible with the tile you are using and the substrate you are installing it on. You should also make sure that the mud bed is level and smooth, as any imperfections can cause the tiles to not sit properly.
When installing a mud bed, it is important to allow the mud bed to dry completely before you start tiling. To do this, you should wait at least