At the opening ceremonies, several bands played a march composed by the gig harbor postmaster. The bridge cost $6.4 million; tolls started at 55 cents and were cut to 50 cents two months later when the bonds were refinanced. Thursday, november 7, 1940. For bridge engineers, it’s a day that forever lives in infamy.
How Much Did the Tacoma Narrows Bridge Cost?
The Tacoma Narrows Bridge, located in Washington State, has been a source of fascination and wonder ever since its completion in 1940. It was the third-longest suspension bridge in the world when it opened and the first to be constructed in the United States. The bridge spans the Tacoma Narrows strait of Puget Sound and connects Tacoma on the mainland to the Kitsap Peninsula. The construction of this 1,854 feet long bridge was a feat of engineering and has become a symbol of Tacoma’s resilient spirit. But, how much did the Tacoma Narrows Bridge cost?
The total cost of the project was estimated to be around $6.4 million, which was a significant amount of money for the time. The bridge was funded by the Washington State Department of Highways, with additional funds from the federal government. The bridge was the first public works project in the state to be funded by the federal government, which shows how important the project was. The funding of the bridge was also a big deal for the local economy, as it brought in a lot of jobs and money to the area.
The construction of the Tacoma Narrows Bridge was a complex process that took four years to complete. The entire project was
Leave a comment