How Long Did It Take to Build the Channel Tunnel?

The channel tunnel is one of the biggest engineering projects ever undertaken in the uk. Taking more than five years to complete, with more than 13,000 workers from england and france collaborating to realize the vision, the tunnel has been named one of the seven wonders of the modern world.

How Long Did It Take to Build the Channel Tunnel?

The Channel Tunnel, also known as theChunnel, is a railway tunnel connecting France and England beneath the English Channel.

It is 31 miles long, making it the longest undersea tunnel in the world. Construction of the tunnel began in 1988 and was completed in 1994.

It took six years to build the Channel Tunnel, a remarkable feat of engineering that has benefited both countries. The Channel Tunnel project was first proposed in 1802 by French engineer Albert Mathieu, but it wasnt until the 1980s that the project became a reality.

France and England both agreed to build the tunnel in 1986, and construction began with the excavation of the two tunnels in 1988.

The two tunnels, one for trains traveling from England to France, and one for trains traveling from France to England, were dug using a technique calleddrill and blast.

A continuous line of explosives was detonated along the tunnels length in order to break through the rock and soil below the English Channel.

The construction process required a massive amount of labor, with thousands of workers from both countries working around the clock for six years. It was also a very expensive project, costing £10 billion (over $13 billion). After the initial blasting