How Long Does It Take to Build a Concrete Pool?

The average time frame to build a concrete pool is 3–6 months. Within that time, the concrete pool shell has to sit empty for 30 days while the concrete cures. For comparison, a fiberglass pool takes only 3–6 weeks and is full of water by day 2.mar 15, 2019

How Long Does It Take to Build a Concrete Pool?

Building a concrete pool is a major undertaking that requires a lot of planning and preparation. It is not something that can be done quickly or without professional help. So, how long does it take to build a concrete pool?

The exact amount of time it takes to build a concrete pool varies depending on the size and complexity of the project. Generally, it takes anywhere from 4 to 8 weeks for the entire project to be completed. This includes the excavation, forming, pouring, and curing of the concrete.

The excavation is the first step in the process and involves digging out the area that the pool will occupy. This is done by a professional excavation company and can take anywhere from a few days to a few weeks depending on the size and complexity of the pool.

Once the excavation is complete, the next step is forming the pool. This is done by installing the forms that will shape the pool. This takes anywhere from a few days to a few weeks, depending on the size and complexity of the pool.

After the forms are in place, the next step is pouring the concrete. This is also done by a professional and can take anywhere from a few days to a few weeks, depending on the size and complexity of the pool.

Once